Facilities

The factory is split into two main areas, the GRP area and the Thermoplastics shop. The GRP section of the factory is 28,000 square foot complete with overhead cranes.

The thermoplastic shop is 10,000 square foot and houses a butt welding machine, in a dust free room, which is separated from the main part of the factory.

SILOTANK has one of the most modern manufacturing facilities for individually fabricated plastic tanks in Ireland and the UK.

Engineering Facilities
We are presently operating on AutoCAD 2004.

We employ two full time mechanical engineers and chemical engineer.